Old ice box removed.
Styrofoam insulation and support framing needed to be totally removed.
All cleaned up and painted. Ready to install fridge.
We picked up a used fridge from the local used appliance store. I put it in place to see how it would fit before painting.
Took the door off and sealed of interior with blue tape and newspaper.
Painted and put the door back on.
Installed and secured with aluminum angle. Made a door and installed for old heater opening.
All done. Ready for some elbow grease here and there. Need to order a water facet and install for sink.
No comments:
Post a Comment