After the electrical upgrade was completed it was time to turn to fixing delaminated panels and rehab the under seating storage. Skinned the bad areas with same panel wood as ceiling (screws and glue) and cleaned, strengthened storage.
Port side bottom corner. New framing and 3/4" plywood to strengthen corner.
Corner braced with 3/4" plywood - screwed from outside thru to rear frame.
Port side corner viewed from doorway.Delaminated rear corner panel. First coat of paint to the drawer stand.
I screwed down to floor 1 X 3/4" fir to floor and put 1/8" plywood on top to give storage a new bottom.
Water tank removed and new bottom over old floor as describe above.
I had to make a new door under pullout. Used wood from overhead bed.
Took closet door off for painting and installed a brace to stiffen wall.
Free!!!
Closet door painted and back in its place.
Rear portion painted. Also painted plywood that cushions sit on.
Ready to install table.
Table installed.