Also need to get axle turned back over to stock position.
Saturday, June 15, 2013
Waiting For Warm Weather
It has warmed up for painting - And the exterior has been painted. I'll post pics of the $50 paint job later.
The Fridge
Interior painting is all done. Now it's time to finish the Fridge area (I have learned that the cooking area in a trailer is called the galley) fridge and door + some paint. All the old ice box support was removed and an electrical outlet was installed.
Old ice box removed.
Styrofoam insulation and support framing needed to be totally removed.
All cleaned up and painted. Ready to install fridge.
We picked up a used fridge from the local used appliance store. I put it in place to see how it would fit before painting.
Took the door off and sealed of interior with blue tape and newspaper.
Painted and put the door back on.
Installed and secured with aluminum angle. Made a door and installed for old heater opening.
All done. Ready for some elbow grease here and there. Need to order a water facet and install for sink.
Old ice box removed.
Styrofoam insulation and support framing needed to be totally removed.
All cleaned up and painted. Ready to install fridge.
We picked up a used fridge from the local used appliance store. I put it in place to see how it would fit before painting.
Took the door off and sealed of interior with blue tape and newspaper.
Painted and put the door back on.
Installed and secured with aluminum angle. Made a door and installed for old heater opening.
All done. Ready for some elbow grease here and there. Need to order a water facet and install for sink.
Subscribe to:
Posts (Atom)